Contactar Proveedor? Proveed
Jasmine Zhang Mr. Jasmine Zhang
¿Qué puedo hacer por ti?
Contactar Proveedor
TORICH INTERNATIONAL LIMITED
TORICH INTERNATIONAL LIMITED
I agree Bossgoo.com will authorize the transaction payment on Bossgoomall.com. Bossgoomall.com is a subsidiary of Bossgoo.com group, Please rest assured to trade.
I agree
Home > Lista de Productos > Tubo de acero al carbono > Tubo DOM > CDW estirado sobre tubo de acero de mandril

CDW estirado sobre tubo de acero de mandril

Payment Type:
L/C,T/T,D/P,Paypal,Money Gram,Western Union
Incoterm:
FOB,CFR,CIF,EXW,FCA,CPT,CIP
Min. Order:
1
Delivery Time:
20 Days
Transportation:
Ocean,Land,Air
Port:
SHANGHAI,SHANGHAI,SHANGHAI
Share:
  • DDescripción
Overview
Product Attributes

ModeloCDW Drawn Over

MarcaENRIQUECER

Supply Ability & Additional Informations

PaqueteEn paquetes

productividad500 Ton Per Month

transporteOcean,Land,Air

Lugar de origenZhejiang China

Capacidad de suministro500 Tons per month

Certificados ISO

HS-Code7304193000

HafenSHANGHAI,SHANGHAI,SHANGHAI

Tipo de PagoL/C,T/T,D/P,Paypal,Money Gram,Western Union

IncotermFOB,CFR,CIF,EXW,FCA,CPT,CIP

Plazo de entrega20 días

Packaging & Delivery
Package Type:
En paquetes

CDW estirado sobre tubo de acero de mandril


End Shape Beveled end, plain end, vanished, or adding plastic caps to protect the two ends as per customer's requirements
Surface Oiled, Galvanized, Phosphate etc
Treatment
Technique Cold drawn
Application 1. Automotive and mechanical pipes
2. Petroleum cracking pipes
3. High Pressure Boiler Pipe
4. Low and middle pressure fluid transportation pipeline
5. Chemical fertilizer equipment pipes
6. Heat exchanger pipes
Delivery 1. BK (+C) No heat treatment after last cold forming process.
Conditions 2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
  3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
  4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
  5. NBK (+N) After the final cold forming process the tubes are annealed above the upper transformation point in acontrolled atmosphere.
Package 1. Bundle Packing.
2. Plain end or vanished as per customer's request.
3. Wrapped in waterproof paper.
4. Sackcloth with several steel strips.

5. Pack in heavy tri-wall boxes.


drawn over mandrel tube

dibujado sobre el tubo del mandril

drawn over mandrel

dibujado sobre mandril

drawn over mandrel tube


dibujado sobre el tubo del mandril








PRODUCTOS POR GRUPO : Tubo de acero al carbono > Tubo DOM

Contactar proveedor
  • *A:
    Mr. Jasmine Zhang
  • *Mensaje:
    Su mensaje debe ser de entre 20 a 8,000 caracteres.

Inicio

Phone

Skype

solicitar